Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
videos [2020/02/13 11:32] – [Procedures / Work Instructions] rrandall | videos [2020/11/21 10:32] – [Value Stream Mapping Tutorial] rrandall | ||
---|---|---|---|
Line 20: | Line 20: | ||
===== Teams (and prototyping) ===== | ===== Teams (and prototyping) ===== | ||
- | Build a Tower, build a Team | + | Tom Wujec - "Build a Tower, build a Team" |
{{ youtube> | {{ youtube> | ||
Line 36: | Line 36: | ||
How to do Value Stream Mapping – Lesson 4 - The Material Flow | How to do Value Stream Mapping – Lesson 4 - The Material Flow | ||
{{ youtube> | {{ youtube> | ||
+ | |||
+ | |||
+ | ===== Metrological Traceability ===== | ||
+ | |||
+ | Understanding ASTM E74 Calibration Certificates | ||
+ | {{ youtube> | ||
===== Metrological Confirmation (a.k.a. " | ===== Metrological Confirmation (a.k.a. " | ||
==== How to Metrologically Confirm (a.k.a. " | ==== How to Metrologically Confirm (a.k.a. " |