Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
videos [2020/02/13 11:32]
rrandall [Procedures / Work Instructions]
videos [2020/11/21 10:33]
rrandall [Metrological Traceability]
Line 20: Line 20:
 ===== Teams (and prototyping) ===== ===== Teams (and prototyping) =====
  
-Build a Tower, build a Team+Tom Wujec - "Build a Tower, build a Team"
  
  {{ youtube>​DoUx7VzGYKo?​large&​rel=0 }}  {{ youtube>​DoUx7VzGYKo?​large&​rel=0 }}
Line 36: Line 36:
 How to do Value Stream Mapping – Lesson 4 - The Material Flow How to do Value Stream Mapping – Lesson 4 - The Material Flow
  {{ youtube>​WfwS26vHeVI?​large&​rel=0 }}  {{ youtube>​WfwS26vHeVI?​large&​rel=0 }}
 +
 +
 +===== Metrological Traceability =====
 +
 +Understanding ASTM E74 Calibration Certificates - Morehouse Instrument Company
 + {{ youtube>​v=kenY0COFGBo?​large&​rel=0 }}
 ===== Metrological Confirmation (a.k.a. "​calibration"​) Methods ===== ===== Metrological Confirmation (a.k.a. "​calibration"​) Methods =====
 ==== How to Metrologically Confirm (a.k.a. "​calibrate"​) Vernier, Dial or Digital Calipers ==== ==== How to Metrologically Confirm (a.k.a. "​calibrate"​) Vernier, Dial or Digital Calipers ====