 __Necessary Non-Valued Activities (NNVA)__ \\  __Necessary Non-Valued Activities (NNVA)__ \\ 
 Activities that are absolutely necessary to complete work with the present operations and/or equipment. These activities do not add value to the customer but must be performed in order for the process to produce products and/or services that satisfy customer requirements. Activities that are absolutely necessary to complete work with the present operations and/or equipment. These activities do not add value to the customer but must be performed in order for the process to produce products and/or services that satisfy customer requirements.
-<note>NNVAs typically "support" the "core" process(es), and typically includes activities such as purchasing, calibration of Measuring and Test Equipment (M&TE), equipment maintenance, training and/or qualification of personnel, etc.</note>+<WRAP center round info 80%> 
 +NNVAs typically "support" the "core" process(es), and typically includes activities such as purchasing, calibration of Measuring and Test Equipment (M&TE), equipment maintenance, training and/or qualification of personnel, etc. 
 +</WRAP> 
  
 __Non-Value Added (NVA)__ \\  __Non-Value Added (NVA)__ \\ 
Line 31: Line 34:
  
 The eight lean manufacturing wastes, mostly derived from the TPS (Toyota Production System), have a universal application to businesses today. The acronym for the eight wastes is DOWNTIME. The eight lean manufacturing wastes, mostly derived from the TPS (Toyota Production System), have a universal application to businesses today. The acronym for the eight wastes is DOWNTIME.
 +
 +----
  
 {{ :articles:value-diagram_w-smilies_trans.png?direct&600 |}} {{ :articles:value-diagram_w-smilies_trans.png?direct&600 |}}
 +
 +----
 +
 ===== Preparing for a Value-Added Audit ===== ===== Preparing for a Value-Added Audit =====
 [[ https://www.huimfg.com/blog/8-wastes-lean-manufacturing|{{ :articles:hui_8_wastes_graphic.jpeg?direct&350}}]] [[ https://www.huimfg.com/blog/8-wastes-lean-manufacturing|{{ :articles:hui_8_wastes_graphic.jpeg?direct&350}}]]