Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
articles:value_added_audits [2023/07/18 20:59] – [Definitions] rrandall | articles:value_added_audits [2023/07/18 21:00] (current) – [Definitions] rrandall | ||
---|---|---|---|
Line 34: | Line 34: | ||
The eight lean manufacturing wastes, mostly derived from the TPS (Toyota Production System), have a universal application to businesses today. The acronym for the eight wastes is DOWNTIME. | The eight lean manufacturing wastes, mostly derived from the TPS (Toyota Production System), have a universal application to businesses today. The acronym for the eight wastes is DOWNTIME. | ||
+ | |||
+ | ---- | ||
{{ : | {{ : | ||
+ | |||
+ | ---- | ||
+ | |||
===== Preparing for a Value-Added Audit ===== | ===== Preparing for a Value-Added Audit ===== | ||
[[ https:// | [[ https:// |