Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |
| articles:ocap-otd [2023/06/18 01:41] – rrandall | articles:ocap-otd [2023/06/18 01:53] (current) – rrandall |
|---|
| Use the control limit(s) established by the "Process Capability Charts" to determine what your "quality objectives" should be (for purposes of AS9100). Improvements should be driven by data-based management - rather than emotion-based management (e.g., "pie-in-the-sky" objectives that ignore the reality reflected in the process capability charts). | Use the control limit(s) established by the "Process Capability Charts" to determine what your "quality objectives" should be (for purposes of AS9100). Improvements should be driven by data-based management - rather than emotion-based management (e.g., "pie-in-the-sky" objectives that ignore the reality reflected in the process capability charts). |
| |
| | {{page>wiki:pathforward}} |