Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |
articles:ocap-otd [2023/06/17 19:41] – rrandall | articles:ocap-otd [2023/06/17 19:53] (current) – rrandall |
---|
Use the control limit(s) established by the "Process Capability Charts" to determine what your "quality objectives" should be (for purposes of AS9100). Improvements should be driven by data-based management - rather than emotion-based management (e.g., "pie-in-the-sky" objectives that ignore the reality reflected in the process capability charts). | Use the control limit(s) established by the "Process Capability Charts" to determine what your "quality objectives" should be (for purposes of AS9100). Improvements should be driven by data-based management - rather than emotion-based management (e.g., "pie-in-the-sky" objectives that ignore the reality reflected in the process capability charts). |
| |
| {{page>wiki:pathforward}} |