Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
articles:ocap-otd [2023/06/17 19:41] rrandallarticles:ocap-otd [2023/06/17 19:53] (current) rrandall
Line 35: Line 35:
 Use the control limit(s) established by the "Process Capability Charts" to determine what your "quality objectives" should be (for purposes of AS9100). Improvements should be driven by data-based management - rather than emotion-based management (e.g., "pie-in-the-sky" objectives that ignore the reality reflected in the process capability charts). Use the control limit(s) established by the "Process Capability Charts" to determine what your "quality objectives" should be (for purposes of AS9100). Improvements should be driven by data-based management - rather than emotion-based management (e.g., "pie-in-the-sky" objectives that ignore the reality reflected in the process capability charts).
  
 +{{page>wiki:pathforward}}