Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision |
articles:pbs_rp_program [2023/05/08 18:50] – rrandall | articles:pbs_rp_program [2023/05/15 09:56] (current) – rrandall |
---|
| |
<WRAP center round info 80%> | <WRAP center round info 80%> |
I asked an AS9104/1A committee member "how" the AS9100 Auditors would be determining compliance with ISO 19011. His response was "//Based on our conversations within the writing team, the __intent__ of that standard is what they are going for.//" (sic) However, he also noted that "//the IAQG could always come out with a clear ruling//" (sic) at a later date. | I asked an AS9104/1A committee member "how" the AS9100 Auditors would be determining compliance with ISO 19011. His response was that the word "should" must be read as "shall". |
</WRAP> | </WRAP> |
| |
A better alternative is "Supplier Scorecards" provided by larger aerospace customers (e.g., Boeing, Lockheed, Raytheon) or [[https://www.cpars.gov/|CPARs (Contractor Performance Assessment Reporting System)]] provided by government customers. However, these are not always available. | A better alternative is "Supplier Scorecards" provided by larger aerospace customers (e.g., Boeing, Lockheed, Raytheon) or [[https://www.cpars.gov/|CPARs (Contractor Performance Assessment Reporting System)]] provided by government customers. However, these are not always available. |
| |
| {{page>wiki:pathforward}} |