Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
articles:iso_9001_certification_cost [2023/05/19 12:37] – [Estimating the Cost of ISO 9001 Certification] rrandall | articles:iso_9001_certification_cost [2023/06/18 20:01] (current) – [Multi-Site Businesses] rrandall | ||
---|---|---|---|
Line 30: | Line 30: | ||
3. All CBs are required to consult [[https:// | 3. All CBs are required to consult [[https:// | ||
<WRAP center round important 80%> | <WRAP center round important 80%> | ||
+ | [[https:// | ||
+ | <WRAP indent> | ||
+ | //1.9. Effective Number of Personnel \\ | ||
+ | The effective number of personnel consists of all personnel (permanent, temporary, and part-time) involved within the scope of certification including those working on each shift. When included within the scope of certification, | ||
+ | </ | ||
Personnel not involved with the QMS typically include those individuals who have absolutely no direct or indirect involvement with customers or fulfilling customer requirements. Examples may include cafeteria personnel, groundskeepers, | Personnel not involved with the QMS typically include those individuals who have absolutely no direct or indirect involvement with customers or fulfilling customer requirements. Examples may include cafeteria personnel, groundskeepers, | ||
</ | </ | ||
Line 49: | Line 54: | ||
| 276-425 | | 276-425 | ||
| 426-625 | | 426-625 | ||
- | |||
- | <WRAP center round info 80%> | ||
- | [[https:// | ||
- | 1.9. Effective Number of Personnel \\ | ||
- | The effective number of personnel consists of all personnel (permanent, temporary, and part-time) involved within the scope of certification including those working on each shift. When included within the scope of certification, | ||
- | </ | ||
5. The CB will then make adjustments to the number of audits days determined from “Table QMS 1” based upon the complexity of the company (Ref. IAF MD 5, Figure QMS 1 – Relationship between Complexity and Audit Time) and associated risks of its products and/or services (Ref. IAF MD 5, Annex A, Table QMS 2 – Examples of Risk Categories). | 5. The CB will then make adjustments to the number of audits days determined from “Table QMS 1” based upon the complexity of the company (Ref. IAF MD 5, Figure QMS 1 – Relationship between Complexity and Audit Time) and associated risks of its products and/or services (Ref. IAF MD 5, Annex A, Table QMS 2 – Examples of Risk Categories). | ||
Line 99: | Line 98: | ||
==== Multi-Site Businesses ==== | ==== Multi-Site Businesses ==== | ||
- | If your company is a multi-site, there are additional criteria that must be taken into account. With the information above, reference, [[https:// | + | If your company is a multi-site, there are additional criteria that must be taken into account. With the information above, reference, [[https:// |
+ | < | ||
+ | An organization covered by a single management system comprising an identified | ||
+ | central function (not necessarily the headquarters of the organization) at which | ||
+ | certain processes/ | ||
+ | (permanent, temporary or virtual) at which such processes/ | ||
+ | partially carried out.</ | ||
{{page> | {{page> | ||